Building Quotation Sample: How to Write a Professional Quote in 2026, with a Priced Example

· 7 min read

Building Quotation Sample: How to Write a Professional Quote in 2026, with a Priced Example

In a competitive market, an accurate and well-structured building quotation is essential. Whether you run a small building firm or a large contracting business, a clear, professional quote can be the difference between winning and losing a project. This guide walks through how to create an effective building quotation and includes a priced sample for a typical UK extension, with prices checked in October 2026.

The sample below is for a 20 m² single-storey rear extension at a standard specification, priced at £2,400/m² excluding VAT. Realistic quotes for this job in 2026 range from about £44,000 to £66,000 + VAT depending on specification and access, with London +20-30%, South East +5-15%, and North, Wales and Scotland about 5-15% lower for labour-heavy work.

ItemDescriptionAmount (ex VAT)
1Preliminaries: site set-up, welfare, skips, scaffolding£4,300
2Groundworks: excavation, foundations, drainage, ground floor slab£7,200
3Brick-and-block cavity walls, insulation, lintels£8,600
4Flat roof: structure, insulation, membrane, rooflight£7,400
5Windows and bi-fold doors, supplied and fitted£6,500
6Opening into the existing house: steel beam, propping, padstones£3,500
7Electrics, heating and plumbing alterations£3,800
8Plastering, screed and internal joinery£2,900
9Decoration and making good£1,300
10Overheads and profit£2,500
Total excluding VAT£48,000
VAT at 20%£9,600
Total including VAT£57,600

Typical exclusions to list underneath: the planning application if one is needed (£548 for a householder application in England from 1 April 2026), the Building Regulations fee (about £550-950), structural engineer's beam calculations (about £300-600), party wall surveyor fees (£700-2,000 per surveyor), kitchen units and floor finishes.

What Is a Building Quotation?

A building quotation (or construction quote) is a formal document that sets out the price for a construction project. It covers materials, labour, plant and other costs, together with the scope, programme and terms. A detailed quotation gives the client a transparent picture of the budget and timeline, which builds trust between contractor and client.

In the UK, a quote and an estimate are not the same thing. An estimate is an informed guess that can change. A quotation is a fixed price for the work described, and once the client accepts it, it forms the basis of the contract. That is why the scope, assumptions and exclusions matter as much as the price.

Why Is It Important to Create a Professional Building Quotation?

The quotation is often the first significant document a potential client receives from your business, so it must reflect your professionalism and reliability. A well-presented quotation shows your expertise and positions your business as the right partner for the project. A detailed quotation also sets out costs and timescales clearly from the start, which prevents disputes later.

An organised, well-written quotation shows that you have thought carefully about the project and answers the client's questions before they ask them. That attention to detail builds confidence in your ability to deliver and increases the chance of winning the contract.

Step-by-Step Guide to Creating a Building Quotation

1. Gather the Necessary Information

Before drafting the quote, collect all the information you need. Visit the site, study the drawings and discuss the project with the client to understand the size of the building, the specification and any constraints such as access or parking. An accurate building quotation depends on a full understanding of the client's requirements.

Then estimate the costs of materials, labour and other expenses, such as plant hire, skips, scaffolding, permits and insurance. Use current prices: construction material prices rose 6.4% in the year to August 2026, so supplier price lists from last year will understate the cost. Typical labour-only day rates are £200-300 for skilled trades and £220-320 for electricians and plumbers outside London.

Once the data is collected, organise it so that the quotation is clear, logical and easy to follow. The more detailed the quotation, the fewer surprises during the project, and the smoother your working relationship with the client.

2. Select the Appropriate Format

The right format makes the quotation look professional. It should be easy to read and visually clean. Most contractors send a PDF, because it keeps the layout the same on every device. Common working formats include Google Docs, Word and Excel.

Google Docs makes it easy to share and edit a draft with the client. Excel or Google Sheets are better for detailed cost breakdowns with many materials and labour items. Whichever format you choose, make sure it suits both your business and the client.

3. Structure Your Building Quotation Clearly

A well-structured quotation makes the proposed costs and project details easy to understand. Start with your company information: logo, address, contact details, company number and VAT number if you are registered. Then add the client's name and address and the site address.

Next, describe the scope of the project: the work to be done, the materials and specification, and any specific requirements from the client. Refer to the drawings and their revision numbers, so it is clear what the price is based on.

Then give the cost breakdown, as in the sample above. This is the most important part of the quotation, because it shows the client where their money goes. Split the costs into clear items and state the VAT position. Extensions and renovations carry 20% VAT if you are VAT-registered, new houses are zero-rated, and the installation of energy-saving materials such as heat pumps, solar PV and insulation is zero-rated until 31 March 2027 and 5% from 1 April 2027.

Include the programme, with the start date and duration of each main stage, to manage the client's expectations. Finally, set out the terms and conditions: how long the quote is valid (often 30 days, given current price rises), the payment schedule, how variations are priced and agreed, and how delays are handled.

4. Personalise the Quotation for the Client

A personalised quotation makes a real difference to how it is received. Address the client by name and tailor the document to their project. Instead of generic wording, refer to the specific features of their building and show that you have considered their requirements.

Taking time to personalise the quote helps it stand out and shows the client you are genuinely interested in their project. That attention to detail builds rapport and makes the quotation more persuasive.

5. Review the Quotation for Accuracy

Before sending, review the quotation carefully. Check that the figures add up, the programme is realistic and the terms are clear. Check spelling and grammar too, as small errors undermine a professional document.

Make sure nothing is ambiguous. The client should understand exactly what is offered, and what is excluded, without needing to ask. This prevents misunderstandings and makes the process smoother for both sides.

6. Send the Quotation to the Client

Choose the sending method with care. Emailing a PDF is usually the most professional approach, as the formatting stays intact and the document is easy to open. Some contractors also hand over a printed copy for larger projects.

Alternatively, cloud platforms such as Google Drive or Dropbox allow easy sharing and updates, which helps if you expect the client to ask for changes.

7. Follow Up with the Client

After sending the quotation, follow up to check that the client has received it and to answer any questions. A short call or email shows that you are proactive and committed to their project, and helps move the decision forward.

Most clients appreciate the chance to discuss the quotation and clear up uncertainties. Following up also increases the chance that the quote is accepted and leads to a signed contract.

Tools for Streamlining the Quotation Process

Several tools help you create, manage and send quotations more efficiently. Quotation and job management software such as Procore or Buildxact offers templates, automatic calculations and client tracking, and lets you tailor each quotation to the client.

Spreadsheets such as Google Sheets or Excel let you build editable cost breakdowns that update quickly if the scope changes. If you do not have time to measure and price a job yourself, an independent estimate, such as one from estiMedes, can provide the priced breakdown from the drawings for you to turn into your quotation.

Conclusion

An effective building quotation is essential for any contractor who wants to win new work. A well-structured quote gives clarity, shows professionalism and makes it easier for clients to decide. Use the sample above as a starting point: a clear scope, an itemised price that adds up, the VAT position, the exclusions and fair terms.

Attention to detail, personalisation and clear communication are what make a quotation succeed. With the right approach, your building quotation becomes a powerful tool for growing your business and building lasting client relationships.