Construction inflation decides whether a budget set today still works when the builder starts on site. It affects contractors, clients, investors and, in the end, home buyers. This guide explains what construction inflation is, where the main UK indices stood in 2026 and what the forecasts say for 2027-2028. All figures below are annual percentage changes in price, not costs per m², and were checked in October 2026.
| Measure | 2024 | 2025 | 2026 (latest) | Forecast |
|---|---|---|---|---|
| BCIS All-in Tender Price Index (what clients pay) | +2.8% | +2.3% to +2.5% | +3.2% (year to Q3 2026) | +2.6% in 2027, +2.9% in 2028 |
| BCIS General Building Cost Index (contractors' input costs) | +4.9% | +2.1% | +4.3% (year to Q3 2026) | +2.8% in 2027, +2.7% in 2028 |
| Construction material prices, all work (DBT) | - | - | +6.4% (year to August 2026) | Upward pressure from energy and steel |
| ONS Construction Output Price Index | - | - | +1.9% (year to June 2026) | - |
What is Construction Inflation?
Construction inflation is the rise in the cost of construction inputs such as materials, labour, plant and overheads, and in the prices that clients pay for finished work. It is driven by supply chain problems, energy prices, labour shortages, regulation and the level of demand.
Two families of index measure it. Cost indices, such as the BCIS General Building Cost Index, track what contractors pay for labour and materials. The BCIS All-in tender price index tracks what contractors charge clients in accepted tenders. The gap between the two shows how much of the cost increase contractors are passing on, and how much they are absorbing in their margins.
Where Construction Inflation Stands in 2026
The sharp post-pandemic spike has passed, but costs are rising faster again. BCIS reports that tender prices rose 3.2% and building costs 4.3% in the year to Q3 2026, with quarterly rises of 0.7% and 1.6%. Costs are running ahead of tender prices because workloads are subdued and contractors are keeping bids competitive.
Materials are the main pressure point. Department for Business and Trade (DBT) data show construction material prices up 6.4% in the year to August 2026, up from 3.2% in the year to April. Materials for new housing rose 5.6%. The picture is uneven:
- Fabricated structural steel: +21.2%, the largest rise of any resource BCIS tracks.
- Rigid pipes and fittings: +15.5%.
- Imported sawn wood: -1.6%.
- Reinforcing bar: down about 7% in the year to March 2026.
The ONS Construction Output Price Index, which covers all new work and repair, rose a more modest 1.9% in the year to June 2026.
The Forecast for 2027-2028
BCIS expects tender prices to rise 3.0% in the year to Q4 2026 and by about 3% a year through 2027-2028 (costmodelling's series gives +2.6% for 2027 and +2.9% for 2028). Over five years to Q3 2031, tender prices are forecast to rise 14.1% and building costs about 14%. Output is expected to recover slowly: BCIS forecasts new-work output down 3.7% in 2026 and up 2.2% in 2027, while CITB expects -0.2% in 2026, +1.8% in 2027 and +2.8% in 2028.
Key Trends to Watch
- Energy prices: the Ofgem price cap rose 4% to £1,723 a year from 1 October 2026, and analysts expect a further rise of around 14-16% in January 2027. Energy feeds straight into cement, bricks, blocks, glass, plasterboard and haulage.
- Steel trade measures: since 1 July 2026 a 50% tariff applies above quota and tariff-free quotas were cut by 51%. The UK carbon border adjustment mechanism (CBAM) starts in January 2027, adding cost to imported steel.
- Labour: CITB's Workforce Outlook 2026-2030 says the industry needs 41,200 extra workers a year, around 206,000 by 2030. In the FMB's State of Trade survey for the second half of 2025, 57% of small builders reported rising wages and 72% reported skilled-labour shortages. The April 2025 rise in employer National Insurance is still feeding through.
- Regulation: the Future Homes Standard was published in March 2026 and becomes mandatory for new homes from 24 March 2027, adding about £4,000-10,000 per home for heat pumps, fabric upgrades and solar PV.
- Countervailing factors: weak workloads keep tendering competitive, and possible interest-rate rises late in 2026 could cool demand further.
Sector-Specific Impacts and Outlook
Housing
The BCIS Private Housing Construction Price Index rose 2.3% in Q1 2026 and 3.3% in Q2 2026, and housebuilders expected a further 1.3% rise in Q3. New-housing materials are up 5.6%, and the Future Homes Standard adds a step change in cost for homes that start under the new rules from 2027.
Commercial Construction
Steel-framed offices, warehouses and retail units feel the steel rise most. A structural steel frame, supplied, fabricated and erected, now typically costs £3,100-4,300 per tonne excluding VAT, and the tariff and CBAM changes keep pressure on beam and section prices through 2027. Mechanical and electrical packages are exposed to the rise in pipe and fitting prices.
Infrastructure and Large-Scale Projects
Infrastructure projects run over several years, so small annual changes compound into large sums. Energy-intensive materials such as concrete and steel make up a high share of their cost. Clients and contractors need to agree early how inflation risk is shared, whether through fixed prices, fluctuation clauses or index-linked adjustments.
How to Allow for Inflation in Your Budget
Every estimate should state its price date. If work starts a year after the estimate, uplift it by the forecast rate: at around 3% a year, a £300,000 build priced in October 2026 would cost about £309,000 to start in October 2027. Self-build guides also recommend a 10% contingency plus a further 5% inflation allowance on top. Remember that inflation rates are national, while price levels vary by region: London +20-30%, South East +5-15%, North, Wales and Scotland about 5-15% lower for labour-heavy work.
An independent estimate, such as one from estiMedes, prices your actual drawings at current rates and shows which items carry the most inflation risk.
Conclusion: Navigating Through Inflation
Construction inflation in the UK is moderate but rising again: BCIS reports tender prices up 3.2% and building costs up 4.3% in the year to Q3 2026, with materials up about 6% and structural steel up about 21%. Around 3% a year is forecast for 2027-2028, with energy, steel trade measures, labour shortages and the Future Homes Standard as the main drivers. Date your estimates, allow for inflation to the start date and review the budget when new index figures are published.